New Telecommunications Standards and Certification Regime: Key highlights of the 2025 draft rules
Introduction
The Department of Telecommunications (DoT) has released the draft Telecommunications (Standards, Conformity Assessment and Certification) Rules, 2025 (Draft Rules), revising and streamlining the framework for the standardisation and certification of the telecom equipment in India.
Notified under Section 19 of the Telecommunications Act, 2023, the Draft Rules seek to establish stringent testing and certification mandates for telecom equipment intended for use or deployment within any telecom network in India to enhance security, interoperability, and quality control across the sector. The Draft Rules will be taken into consideration after 30 days from its publication, and stakeholders can provide objections or suggestions in the interim.
Background
Currently, the regulatory framework governing the testing and certification of telegraph equipment is prescribed under the Indian Telegraph (Amendment) Rules, 2017 (Telegraph Amendment) issued under the Indian Telegraph Act, 1885 (Telegraph Act). The Draft Rules, once finalised and notified, will supersede and replace the Telegraph Amendment. However, the Draft Rules will not impact the validity of existing standards, essential requirements, specifications, testing requirements, and conformity assessments issued by the Central Government or its authorised entities.
Below, we outline the key provisions and potential impact of this regulatory development.
Scope and applicability
The Draft Rules apply to a wide range of entities engaged in the manufacturing, sale, and operation of telecommunications equipment. This includes Original Equipment Manufacturers (OEMs), Authorised Indian Representatives (AIRs) of foreign OEMs, importers, distributors, and sellers of the telecom equipment, authorised entities, as well as the licensees currently operating under the Telegraph Act. These entities will be required to ensure strict compliance with the notified telecommunications standards before deploying or selling telecom equipment in India.
Regulatory oversight and standards development
The Telecommunication Engineering Centre (TEC) and the National Centre for Communication Security (NCCS), both operating under the DoT have been designated as ‘Appropriate Authorities’ responsible for implementing the Draft Rules. The key responsibilities of TEC and NCCS include:
- Drafting and notifying standards and conformity assessment measures for mandatory testing and certification of telecommunication equipment (MTCTE). This includes seeking stakeholder comments on draft standards, and undertaking mandatory review of the standards and conformity assessment measures every 3 years to determine the need for amendments or withdrawals.
- Specifying guidelines for and recognising domestic and accredited international laboratories as Conformity Assessment Bodies (CABs) that conduct conformity assessment testing. However, labs in countries sharing a land border with India are excluded from this recognition process.
- Issuing Certificates of Conformity (CoC) for telecom equipment basis the test reports by CABs.
Conformity assessment and certification
Classes of entities covered by the Draft Rules must ensure compliance with the prescribed conformity assessment measures for all telecom equipment intended for sale or deployment in India, at their own cost. These entities are required to have their telecom equipment tested by CABs and submit the resultant test reports along with fees to the Appropriate Authority to obtain CoCs. Such CoCs have limited validity and are subject to renewal. Additionally, OEMs and AIRs must ensure that standards, including the CoC number and validity, are prominently displayed on the telecom equipment.
Exemptions from conformity assessment
Certain categories of telecommunications equipment are exempt from the conformity assessment and certification requirements, including:
- equipment / samples imported for research, development, demonstration, or testing purposes, subject to compliance with applicable procedures; and
- equipment brought into India for personal use, provided it is not otherwise restricted under Indian law.
Additionally, re-certification of telecom equipment is not required where the equipment model remains unchanged from a previously certified version or where only labelling modifications are made to comply with notified changes in regulatory requirements. The Central Government retains the authority to introduce additional exemptions as necessary.
Enforcement and Penalties for Non-Compliance
Licensed Telecom Service Providers (TSP) and Appropriate Authorities are authorized to issue a discontinuance notice to any user of uncertified telecom equipment. TSPs are permitted to suspend services in case of non-compliance. Additionally, Appropriate Authorities have inspection and monitoring powers to enforce compliance with these Draft Rules. However, services may not be disrupted if the appropriate certification is obtained within the prescribed timelines and on payment of prescribed penalties. The government also has powers to initiate legal action, including seizure and destruction of non-compliant equipment in case of continued violation of the Draft Rules.
Digital implementation and Compliance Portal
To streamline regulatory compliance, the Central Government will introduce a dedicated digital portal for implementation of the Draft Rules. Standards, measures, updates on compliance procedures, fees, and notices of non-conformity, etc. will be regularly published on such portal. This move aligns with India’s broader digital governance initiatives, aimed at reducing bureaucratic inefficiencies and enhancing transparency in the regulatory process.
Conclusion
The Draft Rules seek to enhance security, standardisation, and compliance oversight, thereby strengthening India’s telecom infrastructure and safeguard national telecommunications networks. The exclusion of laboratories in countries sharing a land border with India may necessitate entities to undertake adjustments in their testing and certification strategies for certain foreign manufacturers, requiring them to reconfigure their compliance frameworks to align with the new regulatory requirements.
Once the Draft Rules are finalised and notified, companies must assess their existing equipment, review testing procedures, and align with certification requirements to avoid market access delays or regulatory penalties. It is however unclear whether the Draft Rules will apply only to complete in built products, similar to the present MTCTE regime.
- Harsh Walia (Partner), Shobhit Chandra (Counsel) and Khyati Goel (Associate)
For any queries please contact: editors@khaitanco.com
We have updated our Privacy Policy, which provides details of how we process your personal data and apply security measures. We will continue to communicate with you based on the information available with us. You may choose to unsubscribe from our communications at any time by clicking here.
For private circulation only
The contents of this email are for informational purposes only and for the reader’s personal non-commercial use. The views expressed are not the professional views of Khaitan & Co and do not constitute legal advice. The contents are intended, but not guaranteed, to be correct, complete, or up to date. Khaitan & Co disclaims all liability to any person for any loss or damage caused by errors or omissions, whether arising from negligence, accident or any other cause.
© 2024 Khaitan & Co. All rights reserved.
Mumbai
One World Centre
10th, 13th & 14th Floor, Tower 1C
841 Senapati Bapat Marg
Mumbai 400 013, India
Mumbai
One Forbes
3rd & 4th Floors, No. 1
Dr. V. B. Gandhi Marg
Fort, Mumbai 400 001
Delhi NCR (New Delhi)
Ashoka Estate
11th Floor, 1105 & 1106,
24 Barakhamba Road,
New Delhi 110 001, India
Kolkata
Emerald House
1B Old Post Office Street
Kolkata 700 001, India
Bengaluru
Embassy Quest
3rd Floor
45/1 Magrath Road
Bengaluru 560 025, India
Delhi NCR (Noida)
Max Towers,
7th & 8th Floors,
Sector 16B, Noida
Uttar Pradesh 201 301, India
Chennai
8th Floor,
Briley One No.30
Ethiraj Salai
Egmore
Chennai 600 008, India
Singapore
Singapore Land Tower
50 Raffles Place, #34-02A
Singapore 048623
Pune
Raheja Woods
03-108-111, 3 Floor
8, Central Avenue, Kalyani Nagar
Pune - 411 006, India
Gurugram (Satellite Office)
Suite No. 660
Level 6, Wing B,
Two Horizon Center
Golf Course Road, DLF 5
Sector 43, Gurugram
Haryana 122 002, India
Ahmedabad
1506 - 1508, B-Blockr
Navratna Corporate Parkr
Iscon Ambli Road, Ahmedabadr
Gujarat - 380058