Unravelling the New OSP Guidelines
Introduction
On 5 November 2020, the Department of Telecommunications (DoT) released ‘New Guidelines for Other Service Providers’ (New OSP Guidelines). The New OSP Guidelines supersede the ‘terms and conditions – Other Service Provider Category’ dated 5 August 2008 along with all its amendments (Old OSP Guidelines). With the New OSP Guidelines, the DoT has made significant alterations to the preceding regime that are expected to have far-reaching benefits for the outsourcing industry in India.
Background
The regime relating to OSPs has been subject to much criticism over the past few years on account of its rigid and outdated provisions. The archaic nature of regulatory conditions had pushed the industry against the wall and curtailed its ability to deploy new age technologies to achieve efficiency and economies of scale.
Key takeaways
The key takeaways from the New OSP Guidelines are set out below:
1. |
Applicability: The ambiguous definition of ‘Application Services’ under the Old OSP Guidelines has been done away with. The new regime is applicable only to entities which provide voice-based Business Process Outsourcing (BPO) services. Therefore, it is now possible that BPOs providing non-voice/ data-based services may be excluded from the ambit of the New OSP Guidelines. |
|
2. |
Exemption from registration: Even for voice-based BPOs, no registration certificate will be required. This means that such BPOs will not have to undergo the lengthy process of obtaining registration after submitting various supporting documents, including network diagrams that are approved by telecom service providers (TSP). |
|
3. |
Same entity may have multiple OSP centres: As was the case earlier, an OSP centre is a location in India where infrastructure for an OSP is deployed. Therefore, same entity may have multiple OSP centres under the New OSP Guidelines as well. |
|
4. |
Notable dispensations for OSPs: The following dispensations are only provided to OSPs under the New OSP Guidelines: |
|
|
a. |
Interconnection of PSTN with VPN (over MPLS) is permitted: In case two or more OSP centres are connected through a virtual private network (VPN)/ leased circuit and PSTN/ PLMN traffic is collected at one of the OSP centres, then such traffic can be exchanged between other OSP centres using MPLS/ leased circuit. |
|
b. |
Centralised internet connectivity: An entity having multiple OSP centres may obtain internet connection at a centralised location and such internet can be accessed by other OSP centres using leased line/ MPLS VPN. This is an important exemption as it will minimise costs ordinarily incurred in obtaining multiple internet connections at each OSP centre under the earlier regime. Further, permitting such internet traffic to be carried over leased line/ MPLS VPN will guarantee better service levels. |
|
c. |
Interconnection between remote agent and OSP: It is permitted for an agent to remotely connect to the OSP centre as per the New OSP Guidelines (detailed observations are set out in paragraph 5 below). |
5. |
New work from home requirements: The DoT has sought to encourage work from home (WFH) at an unprecedented scale. Going forward, WFH will also include ‘work from anywhere’ (WFA) in India, which means there is no requirement to provide pre-defined locations from where work will be carried out, if the agent is not at the OSP centre. As a major incentive, no bank guarantee or security deposit will be required for availing this facility. Importantly, the permitted mode of connectivity between the remote agent and the OSP centre has not been prescribed. However, the New OSP Guidelines set out that OSPs shall be responsible for any toll bypass related violation. This may lead to an inference that there is no prescribed method (e.g. TSP provisioned VPN/ secured VPN) for such connectivity and therefore, it has been made technology neutral. |
|
6. |
Cloud-based contact centre service providers and Foreign EPABX: The New OSP Guidelines do not expressly clarify whether use of cloud-based contact centre service providers (CCSP) for OSPs will be permitted or not. It only clarifies that International OSPs are permitted to use foreign based EPABX, subject to compliance with Indian laws (including data privacy laws). However, copies of call detail records (CDR) and system logs must be stored at any of the OSP centres in India. It may be possible that the DoT may issue subsequent clarifications on usage of CCSPs by OSP centres. |
|
7. |
Sharing of EPABX: In contrast to the previous regime, the New OSP Guidelines do not lay down any requirements with regard to seeking specific approval of DoT and submission of bank guarantee for sharing of EPABX. The approval required implementation of logical partitioning of EPABX for use between International OSP, Domestic OSP and general office purposes. This is a major dispensation, considering that the requirements of submitting vendor certificates, partition tables and other documents were extremely cumbersome. |
Comment
The DoT must be congratulated for its endeavour to simplify the OSP regime. Firstly, the applicability of the OSP regulatory framework has been streamlined to include voice-based BPOs only. Importantly, with an eye on the current pandemic situation, the Government has allowed the WFH or WFA facility which is likely to prove to be a boon for the sector as well as the economy as a whole.
Having said that, all that glitters is not gold and upon a closer look, there appear to be several areas which may need to be clarified going forward. To begin with, the DoT should provide clarity on whether existing registrations issued to OSPs need to be surrendered or whether they will be deemed automatically cancelled under the New OSP Guidelines. Further, the process for refund of bank guarantees submitted by entities under the old regime remains unclear. Moreover, while the New OSP Guidelines aim to provide special dispensation to OSPs, there is no clarity on how this dispensation can be claimed or enforced in absence of a registration. Therefore, it appears that it will be left to self-assessment by relevant entities.
Clarity on important issues such as how to differentiate between voice and data based OSP centres and use of closed user group (CUG) for OSP functions is missing. In a major setback, the New OSP Guidelines are also silent on issues such as use of cloud based hosted contact centres, permitted connectivity between OSPs and remote agents in case of work from outside of the OSP centre, etc.
It will have to be seen if these loopholes are addressed by the DoT in due course by issuance of clarifications and amendments. For the time being, the New OSP Guidelines are bound to provide food for thought.
- Harsh Walia (Partner), Shobhit Chandra (Principal Associate) and Piyush Ranjan (Senior Associate)
For any queries please contact: editors@khaitanco.com
We have updated our Privacy Policy, which provides details of how we process your personal data and apply security measures. We will continue to communicate with you based on the information available with us. You may choose to unsubscribe from our communications at any time by clicking here.
For private circulation only
The contents of this email are for informational purposes only and for the reader’s personal non-commercial use. The views expressed are not the professional views of Khaitan & Co and do not constitute legal advice. The contents are intended, but not guaranteed, to be correct, complete, or up to date. Khaitan & Co disclaims all liability to any person for any loss or damage caused by errors or omissions, whether arising from negligence, accident or any other cause.
© 2024 Khaitan & Co. All rights reserved.
Mumbai
One World Centre
10th, 13th & 14th Floor, Tower 1C
841 Senapati Bapat Marg
Mumbai 400 013, India
Mumbai
One Forbes
3rd & 4th Floors, No. 1
Dr. V. B. Gandhi Marg
Fort, Mumbai 400 001
Delhi NCR (New Delhi)
Ashoka Estate
11th Floor, 1105 & 1106,
24 Barakhamba Road,
New Delhi 110 001, India
Kolkata
Emerald House
1B Old Post Office Street
Kolkata 700 001, India
Bengaluru
Embassy Quest
3rd Floor
45/1 Magrath Road
Bengaluru 560 025, India
Delhi NCR (Noida)
Max Towers,
7th & 8th Floors,
Sector 16B, Noida
Uttar Pradesh 201 301, India
Chennai
8th Floor,
Briley One No.30
Ethiraj Salai
Egmore
Chennai 600 008, India
Singapore
Singapore Land Tower
50 Raffles Place, #34-02A
Singapore 048623
Pune
Raheja Woods
03-108-111, 3 Floor
8, Central Avenue, Kalyani Nagar
Pune - 411 006, India
Gurugram (Satellite Office)
Suite No. 660
Level 6, Wing B,
Two Horizon Center
Golf Course Road, DLF 5
Sector 43, Gurugram
Haryana 122 002, India
Ahmedabad
1506 - 1508, B-Blockr
Navratna Corporate Parkr
Iscon Ambli Road, Ahmedabadr
Gujarat - 380058